| J&P Group – Contracts Awarded over the last two years |
| (Note: any currency conversions are made with exchange rate at date of contract award) |
| LIBYA |
| PROJECT |
CONSULTANTS |
CLIENT |
| Electrical Interconnection of LPG Plant & Oil Terminal PN673 |
|
|
| Electrical Works - Engineering, Supply, and Installation of OTP Plant and LPG Plant |
Zueitina Oil Company |
Zueitina Oil Company |
| Communications - Supply and installation of grounding materials, wiring and accessories & supply and installation of miscellaneous materials required for a complete and functional system |
|
|
| Civil Works - OTP Plant and LPG Plant & Trenching between the OTP and LPG Plants for 34.5kV & FOC cables & between OTP Plant and Communications Building for FOC Cables |
|
|
| Erection and Construction of Tazerbo Well Field Water Treatment Facilities-East |
|
|
| Erection and Construction of Degassing, Chlorination and Fe/Mn Removal Facilities for 54 No. Wells. |
Great Man-Made River Authority |
IDRECO S.p.A |
| Construction and Commissioning Works for Main Civils at NC174 |
|
|
| Design, Engineering, Procurement, Construction and Commissioning for the Development of NC-174 (Elephant Field). |
AGIP |
AGIP Oil Company Ltd |
| The Works comprise a full range of remote location facilities including; accommodation, Offices, Recreation Facilities, Workshops and all utilities. |
|
|
| Construction and Commissioning Works for Electrical Supply Contract |
|
|
| Design, Engineering, Procurement, Construction and Commissioning for the Development of NC-174 (Elephant Field). The works comprise of Sub-Stations, Transformers, Overhead Transmission Lines along 75Km route Pipeline etc. etc. |
AGIP |
AGIP Oil Company Ltd |
| Construction and Commissioning Works for Pipeline at NC174 |
|
|
| Design, Engineering, Procurement, Construction and Commissioning of Trunklines from well pad sites and 24" export pipeline from GOSP; Pig Launcher to NC-115 and Field Receiver Facilities. |
AGIP |
AGIP Oil Company Ltd |
| Sabah Water Injection System - Phase 1 Installation |
|
|
| Construction of Water Injection Sytem - Phase I consists of Design, Engineering, Procurement, Supply of Materials. |
Zueitina Oil Company |
Zueitina Oil Company |
| The Work comprise of Installation of Pumps and Facilities, Flowlines & Wellhead Tie-ins, Civil, Electrical and Instrumentation, Testing and Commission. |
|
|
| Installation of NC-186 Field Facilities |
|
|
| Design, Engineering Works and Installation of 18" Pipelines. The Work comprise of Stringing, Ditching, Welding, Coating, Wrapping and Lowering into Ditch, Backfilling, Installation of Pig Receiver and Launcher, Construction of Sump Tanks, Installation of CP System, Installation of Chemical Injection Units etc. etc. |
Repsol Oil Operations |
Repsol Oil Operations |
| Construction of Beverage Plant |
|
|
| Design, Engineering, Procurement and Supply materials, Equipment and Detailed Site Survey for the Construction of Beverage Plant Hangar, Administration Building, Parking Area, Sales Office etc. etc. |
Africa Bottling Operation Ltd. |
Africa Bottling Operation Ltd. |
| Installation of 21 Nos 6" Flowlines and 2 Nos 12" and 2 Nos 6" Inter-Field Trunklines |
|
|
| Design, Engineering Works and Installation of 6" diameter X42 Pipeline (Inter-Field Trunklines), 6" diameter X42 Pipeline (Flowlines), 12" diameter X52 Pipeline (Inter-field Trunklines), 6" diameter X42 (Flowlines) in D Field. The Works includes stringing, ditching, bedding, welding, coating, wrapping, backfilling, Cathodic Protection, Hydrotesting, Marker Posts and Commissioning. |
Repsol Oil Operations |
Repsol Oil Operations |
| Construction and Installation of Asphalt and Concrete Works for Airport and Road at El-Sharara Field |
|
|
| Design, Engineering, Procurement, Supply and Constructions of Runway 1920m (length), Runway 2 No. 30m (length) Taxiway, Access Paved Road of 3 Km and Car Park Areas at NC115 El Sharara Oil Field. |
Repsol Oil Operations |
Repsol Oil Operations |
| Construction of Prefabricated Offices and Hangar |
|
|
| To Design and Construct Prefabricated Offices, Excavations for Pumping Station and Flow Control Station. |
Vinci Construction |
Vinci Construction Grands Projects |
| Construction of Early Production Facilities at NC 186 |
|
|
| Construction of Early Production Facilities comprising of Supply and Installation of East & West Manifolds Work, Inlet Manifold Works, Inlet Manifold Area Works, NC-115 Area Tie-ins Work, Production Facilities etc. etc. |
Repsol Oil Operations |
Repsol Oil Operations |
| Construction of Gas Oil Separation Plant (GOSP) at NC 186 |
|
|
| Design, Engineering, Procurement, Supply and Installation. |
Repsol Oil Operations |
Repsol Oil Operations |
| The Works comprise Foundations for Crude Booster Pump, Interfield Oil Transfer Pump, Degassed Crude Pump, Fire Water Pumps, Crude Transfer Pumps, Sump Tank, Pump, Detection System, Fire Fighting System Net Work, Perimeter Fencing, Piperacks and Pipeway |
|
|
| Construction of Two Buildings at NC 186 and GOSP 'B' |
|
|
| Design, Procurement and Construction of two Accommodation Blocks at NC-186 and NC115. The Construction Works include installation of Water Tank, SepticTank, External Lighting, Fencing etc. |
Repsol Oil Operations |
Repsol Oil Operations |
| Construction of Foundation, Erection of Overhead Transmission Line Towers & Stringing of Cable etc. at El-Sharara Field |
|
|
| Erection of Overhead Transmission Line Towers & Stringing of Cable at El-Shara Oil Field as follows: |
Repsol Oil Operations |
Repsol Oil Operations |
| - 118 No. Towers of 66kV Overhead Lines from NC-115 GOSP 'A' to NC-186 GOSP |
|
|
| - 29 No. Towers of 33kV Overhead Lines from NC-186 GOSP to West Manifold Area |
|
|
| - 36 No. Towers of 33kV Overhead Lines from NC-186 GOSP |
|
|
| Installation of Geomembrane for Liquid Proofing of the Tank Areas |
|
|
| Design, Procurement, Supply and Installation of Geomembrane for Liquid Proofing of the Oil Tank Areas comprise of Excavate 40cm layer from existing compacted soil, Supply and lay bottom layer of 10cm sand, Installation of 1st layer of Geotextile (low protection layer), Installation of 1.5mm thick Geomembrane, Installation of 2 nd layer of Geomembrane (upper protection) |
Repsol Oil Operations |
Repsol Oil Operations |
| Installation of 6" carbon steel Pipes at NC115 - Flow lines |
|
|
| Design, Engineering, Procurement, Supply and Installation. |
|
|
| The Works comprise installation of 25Km of 6" Carbon Steel Pipes connecting to Wellheads and Equipment, Hydrotesting, Cathodic Protection and Pre-Commissioning. |
Repsol Oil Operations |
Repsol Oil Operations |
| Installation of 18" Trunk line from D-field to NC-186 |
|
|
| Design, Engineering, Procurement, Supply and Installation. |
Repsol Oil Operations |
Repsol Oil Operations |
| The Works comprise installation of 25Km of 18" Carbon Steel Pipes consists of installation of Pig Receiver and Launcher, Sump Tanks, Installation of CP System and Chemical Injection Units etc. |
|
|
| The Construction of LPG Tanks Bund Walls at Zueitina Terminal |
|
|
| The works comprise to Design and Construct redundant structures, protection to plant utilities and U/g utilities, bundwalls entrance gate, reinforced concrete channels etc. etc. |
Zueitina Oil Company |
Zueitina Oil Company |
| Overhead Transmission line installation form field A to Field D of NC 186 |
|
|
| To Fabricate and Erect 109 No. Towers of 66 Kv Overhead Transmission Line Towers & Stringing of Cable at NC-186 from 'A' Field to 'D' Field. |
Repsol Oil Operations |
Repsol Oil Operations |
| Conversion of Sections of Geological laboratory into offices at Warehouse II Complex |
|
|
| Design and Installation of proprietary partitions, false ceiling, vinyl floor covering, lay heavy duty carpets, complete A/C system, aluminum external doors and airlocks, Telecommunication installations, fittings and fixtures, fire detection and protection. |
Waha Oil Company |
Waha Oil Company |
| Repairs to Crude Oil Tanks & Gas Blanketing of Tanks |
|
|
| Supply all materials and carry out all Repair works to Tank D-107 -Cleaning, Tank Bottom Repairs, Roof Repairs, Tank Shell Repairs, Ringbeam, Tank Stairways, Cathodic Protection, Tank Instrumentation, Tank Interior Coating, External Painting, Testing and Commissioning. |
Zueitina Oil Company |
Zueitina Oil Company |
| Construction of Mabruk New Warehouse Building |
|
|
| Construction Works - To construct a steel structured Warehouse building with mezzanine floor, air conditioned storage, office area with a Main building dimensions of L=45m x W=20m. Total area is 1370m² |
CPTL |
Compagnie Des Petroles Total - CPTL (TOTAL) |
| Detail Engineering - Scope includes structural stress analysis, electricity load calculations, HVAC and ventilation load calculations and Procure and install a distribution post, distribution panel. |
|
|
| |
| QATAR |
| PROJECT |
CONSULTANTS |
CLIENT |
| Staff Housing for Intercontinental Hotel, Doha |
|
|
| Three story Building (157 room) with Cafeteria, Gym, and associated external works. |
J&P Design Office |
Gulf Hotels |
| Private Residence at Al-Wajbah |
|
|
| Residence complex comprising of two luxury high quality main villas and two majlis, staff quarters, swimming and associated external works. |
Arab Engineering Bureau |
H.E. Sheikh Mohammed Bin Fahed Thani |
| Salwa Interchange, Doha |
|
|
| Construction of a major 3-level road interchange within Doha City. Works included an elevated 3 lane bridge (202m) of twin pre-stressed concrete decks with soil wall approach ramps, an underpass (1,600m) forming part of the City Ring Road system, 4no. ground level concrete bridges, underground surface water storage tanks, the diversion/renewal of major utilities, the upgrading of all adjoining service/side roads, and landscaping of the site. |
Supervisors
High-Point Rendel
Designers
ITALCONSULT |
Ministry of Municipal Affairs & Agriculture, Roads Department |
| Al Gharrafa Interchange, Doha |
|
|
| Construction of 2no. road interchanges within Doha City. The main 3-level interchange works included an elevated 3 lane bridge (202m) of twin pre-stressed concrete decks and soil wall approach ramps, an underpass (720m), 2no. ground level concrete bridges and underground surface water storage tanks. |
Supervisors
Technical S.p.A
Designers
ITALCONSULT |
Ministry of Municipal Affairs & Agriculture, Roads Department |
| The second interchange works included a ground level pre-stressed twin deck concrete bridge structure and a local road system underpass. |
|
|
| The works also involved the diversion/renewal works of major utilities, the upgrading of adjoining service/side roads, and landscaping of the site. |
|
|
| |
| CYPRUS |
| PROJECT |
CONSULTANTS |
CLIENT |
| Refurbishment of Military Port at RAF Akrotiri |
|
|
| Repairs to the outer breakwater, construction of new quay face and pavement, demolition and reconstruction of small craft quay wall, repairs to a steel jetty, reconstruct the ro-ro abutment, demolition of existing Hut and construction of new Plant Shed and Office Workshop |
Gifford + Kalisperas |
Defense Estates (Works) - Ministry of Defense U.K Government |
| Kokkonotrimithia - Astromeritis Highway |
|
Government of Cyprus, Ministry of Communications and Works |
| Construction of a 4-lane dual highway 8.3km long comprising 3 highway bridges, 4 overbridges, underpass, interchange and relevant pipe and box culverts. |
| Vasilikos Power Station Civil Works for Phase II |
|
|
| Construction of Turbine building (for Unit 3) and associated Mechanical and Electrical annexes, covered car park and storage buildings all comprising reinforced concrete foundations and structural steelwork framework. Construction of reinforced concrete foundations for Boiler and relevant external works. |
PB Power |
Electricity Authority of Cyprus |
| Polemidhia and Limassol Port Roundabouts |
|
|
| Upgrading of the existing Limassol By-pass roundabouts (Port and Polemidhia Roundabouts), to grade separated interchanges in order to provide free flow of traffic on the by-pass road, direction Nicosia to Paphos. |
Lardis & Partners in association with Roughton International |
Government of Cyprus, Ministry of Communications and Works |
| Construction of heavy duty pavement at Limassol Port |
|
|
| Construction of heavy duty pavement at Limassol Port |
Cyprus Port Authority |
| FBIS Nicosia Construction Project |
|
|
| Construction of a compound Access Control building and a secondary Vehicular Exit at the FBIS in Nicosia |
FBIS (c/o American Embassy) |
| |
| SAUDI ARABIA |
| PROJECT |
CONSULTANTS |
CLIENT |
| 1500 Person Mess Hall & Recreation Facility, Riyadh |
|
|
| Design and construction of a two storey steel framed Mess Hall and Recreation Facilities Building for 1500 persons including all necessary furniture, fittings and equipment within an existing Air base |
British Aerospace PLC |
Royal Saudi Airforce/British Aerospace PLC |
| Expansion of existing Administration and Aircraft Support Facilities, Riyadh |
|
|
| Design and construction of New Sunshelters, Paint Preparation Hangar, Storage Facilities for F15 Aircraft, Composite Sanding Shop, Repairs to existing pavements and infrastructure for the facilities. |
British Aerospace PLC |
Al-Salam Aircraft Company Ltd. |
| Salwa Project |
|
|
| Commencing in 2004, this project includes the design and construction of Housing, Communal Facilities and Maintenance Facilities complete with infrastructure within a self contained and secure environment for approximately 1500 persons and their families. |
British Aerospace PLC |
British Aerospace PLC |
| |
| GREECE |
| PROJECT |
CONSULTANTS |
CLIENT |
| Egnatia National Highway: Section Asprovalta - Strimonas |
|
|
| (Participation in J.V. 42.97 %) |
Egnatia Odos S.A. |
Egnatia Odos S.A. |
| Construction of a new highway of 22km length, including tunnels of 2x220m and 4 bridges of 630m total length. |
|
|
| Egnatia National Highway. Anthohori - Metsovo Intersection |
|
|
| (Participation in J.V. 24.5 %) |
Egnatia Odos S.A. |
Egnatia Odos S.A. |
| Construction of five new tunnels on Egnatia Highway of a total length of 7,630m |
|
|
| Light Railway Section between Three Bridges – Acharnes |
|
|
| (Participation in J.V. 33 %) |
ERGA OSE S.A |
ERGA OSE S.A. |
| Construction of the infrastructure works of a four-lane railway between Tris Gefires and the Railway Centre of Acharnes |
|
|
| Hellinikon Olympic Complex Construction of Olympic installations for BASEBALL, SOFTBALL, HOCKEY and relative infrastructure and external works at Hellenikon Olympic Complex |
Ministry of Environment, Planning & Public Works Special Office of Public Works/Olympic Games 2004 |
Ministry of Environment, Planning & Public Works Special Office of Public Works/Olympic Games 2004 |
| Athens Subway Extension to Line 3 |
|
|
| (Participation in J.V. 20 %) |
ATTICO METRO S.A. |
ATTICO METRO S.A. |
| Extension of Line 3-Ethiniki Amina-Stavros/ Civil Works (Contract CON-01/009) |
|
|
| ΕΕ5/01 : Eastern Branch of the Olympic Ring road at Kifisias Avenue |
Ministry of Environment, Planning & Public Works EYDE/ESEA |
Ministry of Environment, Planning & Public Works EYDE/ESEA |
| (Participation in J.V. 75 %) |
| Design and construction of interchanges at Faros-Phychico, St. Barbara and Philothei and two pedestrian underpasses. |
| “Agii Anargyri” General Hospital, Kifisia. |
DEPANOM S.A. |
DEPANOM S.A. |
| (Participation in J.V. 35.17 %) |
| Design, construction, supply and installation of medical equipment and outfit of "AGIOI ANARGYRI" General Oncologic Hospital of Kifisia |
| "IPPOKRATION" General Hospital at Thessaloniki |
|
|
| Modernization of E.R. Unit and other areas of "IPPOKRATION" General Hospital at Thessaloniki |
DEPANOM S.A. |
DEPANOM S.A. |
| Peristeri Olympic Boxing Hall |
General Secretariat for Sports |
General Secretariat for Sports |
| (Participation in J.V. 50 %) |
| Design and construction of multi purpose Sporting Centre at Peristeri which will host the Boxing event of the Athens 2004 Olympic Games. |
| Kifissos Avenue from chainage 1+400 to 3+060 |
Ministry of Environment, Planning & Public Works EYDE/ESEA |
Ministry of Environment, Planning & Public Works EYDE/ESEA |
| (Participation in J.V. 25 %) |
| Works include shifting and covering the river of Kifissos, construction of both sides of Kifissos avenue and one side of the railway line and reconstruction of lateral roads. |
| Air Force Cadet – Education Centre at Tatoi |
|
|
(Participation in J.V. 50 %)
Construction of Amphitheatre and Library buildings at the military academy of SMAEK at Tatoi (T-331E) |
Air-Force Works Department |
Air-Force Works Department |
| Egnatia National Highway: Section Nimfopetra-Rentina-Interchange at Asprovalta (10.1-11.2) |
|
|
| (Participation in J.V. 65 %) |
Egnatia Odos S.A. |
Egnatia Odos S.A. |
| Construction of dual carriageway 32.2km long between Nimfopetra and Asprovalta which includes 2 interchanges, and twin tunnel 200m long |
|
|
| Egnatia National Highway: Maintenance of the Section Milia - Grevena - Polymylos (2004-2005) |
Egnatia Odos S.A. |
Egnatia Odos S.A. |
| Adaptation and linkage of Asprovalta-Strymonas section with the existing road network (11.2/3 - 1064) |
|
|
| (Participation in J.V. 23.86 %) |
Egnatia Odos S.A. |
Egnatia Odos S.A. |
| Egnatia Odos : Construction of part of Polymylos interchange, for the hand-over of Polymylos - Veria (4.3.2) |
Egnatia Odos S.A. |
Egnatia Odos S.A. |
| Marathon course (ΕΕ2/04) |
Ministry of Environment, Planning & Public Works EYDE/ESEA |
Ministry of Environment, Planning & Public Works EYDE/ESEA |
| Continuation and upgrading of the works for the Marathon course (3 contracts) |
| Central Municipal Market |
|
Division of special works for the upgrading of areas |
| Paving works around the Central Municipal Market |
| Construction of additional infrastructure railway systems, central building , stations & security system for the Light Railway in the section of SKA - AIRPORT TERMINAL (AD 455) |
ERGA OSE S.A |
ERGA OSE S.A. |
| (Participation in J.V. 25 %) |
| |
| U.A.E. |
| PROJECT |
CONSULTANTS |
CLIENT |
| R-747/1 – Dubai International Airport Roads Improvements – Phase II Expansions – Terminal 3 and Cargo Village Access Roads. |
|
|
| Relocation of Airport road for 1.5 km in association with the development and construction of series of ramps and an underpass to connect the airport to the new terminal 3. All existing services are to be relocated in the new corridor. |
De Leuw Cather Overseas Ltd. |
Dubai Municipality, Roads Dept |
| Emirates New Engineering Centre |
|
|
| Construction of 7 No. Airport Hangars, Workshops, Central Plant, paint shop, internal roads, wheel and break workshop, hazardous store, tire store, ground support equipments, engine workshops etc. |
Airport De Paris |
Emirates Airlines, Dubai, U.A.E. |
| Idhn-Tawaian Diba Road |
|
|
| |
| ETHIOPIA |
| PROJECT |
CONSULTANTS |
CLIENT |
| Addis Ababa – Dessie – Woldiya Road Rehabilitation Project Lot 2: Tarmaber Tunnel |
|
|
| Project No. 8 ACP. ET. 004. |
| Addis Ababa – Jima Road Rehabilitation Project Lot 1 and 2. |
|
|
| Project No. 7 ACP. ET. 099. |
| Addis Ababa – Modjo - Awassa Road Rehabilitation Project. |
|
|
| Project No. 7.ET. 093 and 7.ET.094. |